Portfolio

Dynamic Content Image

The Tide Footbridge

Lifting engineering for the rotation and erection of plate-like modules with very irregular geometries for a landmark foot-bridge part of the large-scale renovation project of the Greenwich Peninsula Region.

Dynamic Content Image

Rio's Olympic Stadium Recovery

Analysis for the recovery of the roofing of the Olympic Stadium for the 2016 Rio de Janeiro Olympic games. The stadium, with its undulated roofing of an atypical arched structure, has a capacity for 47.000 spectators.

Dynamic Content Image

Corinthians Arena

Erection engineering, Heavy Lift analyses and connection peer review for the roofing. Large scale and very irregular steel modules where assembled, weighting up to 400Tons.

Dynamic Content Image

Bellara Steel Complex

Erection engineering for the installation of an Air Separation Unit with three large Coldboxes (weighting up to 160ton). Works included terrain and underground checks using FEA and a comprehensive site assistance campaign.

Dynamic Content Image

Tamoios Cable Crane

Structural engineering for the review of the cables and the supporting steel towers for a 20Ton cable crane system used in a highway construction. Advanced non-linear iterative FE procedures and dedicated codes were used for the cable’s analyses.

Dynamic Content Image

Punta Catalina

720MW Thermoelectric power plant comprised of two boilers weighing approximately 12.000 Tons of steel structures with large application of modularization. Erection studies performed also for turbines, generators, desulfurization systems and a seaport for the coal delivery.

Dynamic Content Image

Ethylene XXI

Implementation of modularization strategy for a 70m (230ft) multi-story industrial building and heavy lift verification for mechanical equipment weighting up to 900Tons.

Dynamic Content Image

Corinthians Arena - Mezzanine

Structural project of the north and south mezzanines of the Corinthians Stadium. The project weighing 400 Tons and with an area of 1800m2 has a complex support typology and holds the north and south large scale screens.

Dynamic Content Image

Corinthians Arena – Temporary Seats

Peer review and site inspection for the structures which supported the temporary seats for the stadium during the 2014 World Cup. The structure was a mixture of wide-flange profiles and scaffolding to accommodate 20.000 spectators.

Dynamic Content Image

Comperj

Structural and rigging verification of steel modules and chimney towers of the HRSG and Boiler of the UTL-11 plant.

Dynamic Content Image

Patío da Marítima

Technical evaluation on the constructability of composite inclined mega-columns with flanged connection. Analysis involved site inspection and reporting.

Dynamic Content Image

Itaqui Sea Harbour

Enlargement of the port terminal.

Dynamic Content Image

Butadiene II

Heavy Lift analyses of the process towers for a Butadiene production plant situated at the petrochemical complex of Braskem. The unit produces 103.000 Tons/year.

Dynamic Content Image

Pampa Sul Chimney

Design of the lifting trunnions and stability check of the shell of a 195m (640ft) steel chimney erected inside a concrete structure.

Dynamic Content Image

Baixada Soccer Stadium

Heavy Lift verification for a retractable roof structure of about 450Tons and 70m (230ft) of free span.

Dynamic Content Image

Hochoy Highway Extension

Rigging engineering for the erection of steel and prestressed concrete beams for the special artworks.